
Add to Cart
1. It has the flexibility of movable and convenient hoisting. As well as the short manufacturing period and the rapid construction without foundation;
2. It has compact structure, small and beautiful appearance. The outer wall of steel plate is sprayed with anti-corrosion and acid resistance, and its service life can reach more than 20 years;
3. Without affecting the operation of the main network. Realize the maintenance of regional power failure and reduce the scope of power outage;
4. It is widely used in temporary power construction site, mobile operation substation, petroleum, chemical industry, drilling platform and other industrial power. It can also be used in urban power grid reconstruction, residential areas, commercial centers and other urban densely populated areas
Product details | describe | MOQ | |||
External dimensions | L6058*W2438*H2591 | 1 units | |||
Internal dimensions | L5850*W2250*H2300 | ||||
Total area / usable area | 15m² | ||||
Exterior color | Color customization | ||||
Internal framework support | Iron keel | ||||
Insulation material | Rock wool sandwich panel (50 mm) / XPS(extruded polystyrene) (200 mm) / color steel sandwich panel (50 mm) | ||||
Base plate | OSB board / plywood | ||||
Interior wall material | Bamboo and wood fiberboard / UV board / Aluminum Composite Panels / metal carved board | ||||
Floor | PVC / wood plastic panel | ||||
Voltage standard | Customize according to customer's local voltage standards | ||||
Standard certification | American Standard, Australian standard, European standard, ISO certification, etc. |
Material :Used/NewShipping Container
Exterior color :Color customization.
Internal wall and specification :Sound insulation material + stainless steel mesh plate
Floor: Patterned steel plate
Door :Fire door /special customization
Voltage Standard :Customize By Local Voltage Standard
Vent: According to customer requirements
STEP1 | The factory determines the delivery time and leases the booking to the shipping company. |
STEP2 | Provide export clearance documents and related expenses. |
STEP3 | The factory sealed the box and shipped it to the port three days in advance. |
STEP4 | The goods leave the port of shipment and are shipped to the port of destination. |
STEP5 | Received the shipping company's delivery notice and proceeded with customs formalities in advance. |
STEP6 | The goods orrive ot the port of destination and are picked up according tothe bill of lading. |
1. Q: Is Shanghai Shiyi a factory or a trading company?
A: Shanghai Shiyi is a container housing, which is located in Baoshan District, Shanghai. Shanghai Shiyi devotes itself to manufacture and renovate the container house since 2013. The workshop of Shanghai Shiyi is accessible to everyone for visiting purpose.
2. Q: How can I get a quotation of the project?
A: If you have your own drawing, we can offer you a quotation according to your design. If you don’t have any draft, our designers will assist you.
3. Q: Does the electric power system work in my country?
A: Our electric power systems are standardized in USA, AU and EU.
4. Q: How to install the containers?
A: We will sent you an installation instruction and video. If you still need help, we can provide on-site service. However, any other extra fees may applied.
5. Q: How do you guarantee the quality of the products?
A:We believe that good quality establishes sustainability. Each product manufactured from our factory has gone through comprehensive and sophisticated testing procedures to ensure 100% qualified before delivering.
6. Q:How about your leading time for production?
A: A normal container house usually takes at least 35 days to be manufactured. A luxury container house takes 10-15 days more than the normal one.
7. Q: How about the shipping?
A: Transportation by sea is a defaulted method to delivery . The forwarding agent can provide a detail of shipping expenses.